Jesaki Furniture Company has two plants that produce lumber used in manufacturing tables and chairs. In 1 day of operation, plant A can produce the lumber required to manufacture 21 tables and 63 chairs, while plant B can produce the lumber required to manufacture 25 tables and 47 chairs. In this production run, the company needs enough lumber to manufacture at least 201 tables and 457 chairs.

If it costs $854 per day to operate plant A and $949 per day to operate plant B, what is the minimum cost of this production run?

$ __________________. Round to the nearest cent.