Compute and plot a diagram of way capacity and running productive capacity as functions of speed for an LRT system with two-vehicle trains operating under safety regime b. Its characteristics are as follows: Cv 174 sps/veh, 21.50 m, s0 3 m, tr 1.0 s, bn 0.9 m/s 2 , be 2.8 m/s 2 .