Each scenario of the IR plan should be tested at least semiannually by performing at least a desk check and a more realistic type of test when possible. What are the options for testing the scenarios in the IR plan?
1) Desk check only
2) Realistic test only
3) Desk check and realistic test
4) No testing is required