Productivity can be increased several folds (doubled or quadrupled) by
a. subordinating the planning and scheduling of all activities to those of the bottleneck
b. putting priority on activities that precede the bottleneck
c. increasing capacity after the bottleneck
d. all of the above
e. none of the above