You are the contracting specialist working in the installation contracting office. This morning you
received two (2) purchase request packages. One is a requirement for a specialized tool used by
the installation civil engineer electrical shop with an estimated price of $17,250. The other is a
requirement for repair of the main power supply unit on the base radar site with an estimated
price of $53,550. You analyze both requirements to determine their publicizing needs.
According to FAR 5.101, which two (2) of the following is a true statement regarding the results of
your analysis of each PR Package? Select the two answers that apply. (2 Points) *
You must publicize the power supply repair requirement in the GPE.
Both requirements must be publicized on the GPE for at least 15 days.
The power supply repair only requires publication in a public place or electronically.
You can post the special tool requirement in a public place or electronically.