You need to design the formworks, produce the shop drawings and estimate the costs for temporary structures (Labor + Materials + Overhead) of your project. The costs will only for temporary structures. Design of the formworks includes the design of wall form, column form, slab form and beam form including shoring and reshoring and their planning sequence. The list of components to be included in the final submission is given below. For designing, you may need to make some assumptions such as temperature, rate of placement and so on. Whatever assumption you make you need to justify it.
The report will be submitted in a professional manner. It will be treated as competitive bid (exact time). You need to show all the detail works and calculations sequentially and systematically.
You will present your project to the class. (Make sure economy, safety, efficiency, quality, availability and reuse are important for any kind of temporary structures).
1 Design Assumptions 10
2 Slab formwork design 10
3 Wall formwork design 10
4 Column formwork design 10
5 Beam formwork design 10
6 Drawings of Slab formwork 10
7 Drawings of Wall formwork 10
8 Drawings of Column formwork 10
9 Drawings of Beam formwork 10
10 Quantity Estimates for Slab formwork 10
11 Quantity Estimates for Wall formwork 10
12 Quantity Estimates for Column formwork 10
13 Quantity Estimates for Beam formwork 10
14 Materials Quantity Summary 10
15 Shoring & Reshoring 10
Total 150 points
Component Dimensions for Parking Garage
Column:
Cross Section: 2'x 2'; Height: 12'
Beam:
Cross Section: 2' x 2'
Slab:
Thickness: 6"
Wall:
Thickness: 8"
Height: 12'