complete the Business proposal **Business Plan Proposal for Water Supply Project from Mekhang Source** **Introduction** As we strive towards comprehensive and efficient water supply services to the residents of Dewathang and Samdrup Jongkhar, it is essential to address the current challenges faced by the existing ADB water supply projects. The scarcity of water, particularly in the dry winter months and the inefficiency of the 4kilo water source due to its limited capacity and irregular supply, necessitate a proactive approach. To ensure a consistent and reliable water supply, the proposal to connect to the Mekhang Source presents a viable and sustainable solution. **Current Scenario** The ongoing ADB water supply projects in Dewathang and Samdrup Jongkhar have indeed made significant contributions to water distribution and reservoir management. However, the limitations of the 4kilo water source are evident, with inconsistencies in supply leading to operational challenges and increased costs due to the necessity of electric pumps. Furthermore, the drying up of the water source in winter and flooding in summer exacerbates the issue and impacts the reliability and quality of the water supplied. **Proposed Solution: Mekhang Source** The proposal to bring water supply from the Mekhang Source, although 16 km away from the current project structure, offers a sustainable and resilient alternative. The gravity-fed system from Mekhang Source ensures a reliable and perennial water supply, eliminating the need for electric pumps and reducing operational costs significantly. By connecting the pipeline from Mekhang Source to the existing distribution network and reservoir, the objective of ensuring 24/7 water supply can be effectively achieved, utilizing the infrastructure already in place by the ADB project. **Key Benefits and Impact** 1. **Sustainability:** Mekhang Source provides a long-term, sustainable solution to the water scarcity issue, ensuring reliability and quality of water supply throughout the year. 2. **Cost-Efficiency:** Gravity-fed systems reduce operational costs by eliminating the need for electric pumps, thereby making the project financially viable in the long run. 3. **Improved Service:** Residents will benefit from a consistent and uninterrupted water supply, meeting the objective of the 24/7 water supply. 4. **Environmental Impact:** The shift to a gravity-fed system reduces energy consumption and carbon footprint, aligning with sustainability goals. **Implementation Plan** 1. Conduct feasibility studies and environmental impact assessments for the Mekhang Source project. 2. continue it..... with above statement ​



Answer :

Other Questions