26.
Under New York Department of Labor regulations, after stripping of all visible asbestos
materials, the next step is:
Visual inspection by air sampling technician
a.
Wait 12 hours
b.
C.
Shut down negative pressure unit
d.
27.
28.
First cleaning
What does a Ground Fault Circuit Interrupter help prevent?
a.
b.
C.
d.
Cracks in the floor
Contamination of the floor
Electrocution
Contamination of the electric supply
What is the Permissible Exposure Limit for exposure to airborne asbestos fibers?
a.
No level is known
b.
C.
0.1 fiber per cubic centimeter over an 8 hour period
0.2 fibers per cubic centimeter over an 8 hour period
d.
0.5 fibers per cubic centimeter over an 8 hour period
29.
After the initial medical examination, asbestos workers are required to be examined every
1 month