kellcatt7394 kellcatt7394 29-05-2024 Engineering Answered A central station has annual factors as follows; Load Factor 58.5%; Plant Capacity factor 40.9%; Plant Use Factor 45.2%. The reserve carried over and above the peak load is 8900kW. Find the installed capacity in kW.