A painting contractor knows from experience that sanding trim requires 0.50-1.00 hours of labor per 100 linear feet, and that staining that same trim requires 0.80-0.75 hours of labor per 100 linear feet. What would be the minimum and maximum number of total hours of labor required for sanding and staining 360 linear feet of trim? (Round each answer to the nearest half-hour.