CDMJ7806 CDMJ7806 20-06-2024 Business Answered Which of the following plans would you recommend to QP based on lowest cost? a. Level production b. Chase demand c. Produce 70,000 in period 1, and 100,000 in periods 2 through 4. d. Produce 90,000 in periods 1 through 3, and 100,000 in period 4.