Which of the following plans would you recommend to QP based on lowest cost?
a. Level production
b. Chase demand
c. Produce 70,000 in period 1, and 100,000 in periods 2 through 4.
d. Produce 90,000 in periods 1 through 3, and 100,000 in period 4.



Answer :

Other Questions