Which of the following is wrong about minimum cost flow problem? P
a. There must be at least one supply node
b. There must be at least one demand node
c. If b(i) is zero, it is a transshipment node
d. If there are two demand nodes, there must be also two supply nodes
e. It can be reduced to a shortest path problem with a modification