konadulaurencia konadulaurencia 20-07-2024 Physics Answered An earthen embankment under construction has a total weight of 15.69 and 10% moisture content. Compute the quantity of water required to be added per 2.83 m³ of earth to raise it's moisture content to to 14% at the same void ratio