haileyfox9854 haileyfox9854 22-07-2024 Engineering Answered Design an integral controller for the plant(Y(s))/(U(s))=(s+4)/(s²+9s+7)to yield a step response with 10% overshoot, a peak time of 2 seconds, and zero steady-state error.