To run a 3-wire cable, a hole is drilled through a plate, the subflooring,
and the finished flooring. The plate is 1.6 centimeters, and the subfloor-
ing is 3.4 centimeters. The finished flooring is 8 millimeters. Find the
depth of the hole in centimeters.