The systems analysts are developing the test plan for the user interface for the Holiday Travel Vehicles system. As the salespeople are entering a sales invoice into the system, they will be able to enter an option code into a text box or to select an option code from a drop-down list. A combo box was used to implement this, because it was felt that the salespeople would quickly become familiar with the most common option codes and would prefer entering them directly to speed up the entry process. It is now time to develop the test for validating the option code fi eld during data entry. If the customer did not request any dealer-installed options for the vehicle, the salesperson should enter "none"; the field should not be blank. The valid option codes are four-character alphabetic codes and should be matched against a list of valid codes. For the Holiday Travel Vehicles problem:
a. Prepare a test plan for the test of the option code field during data entry.
b. Prepare a plan to motivate adoption of the system.
c. Prepare a training plan that includes both what you would train and how the training would be delivered.
d. Prepare a change management plan.
e. Develop a migration plan.