The purpose of this Case Study assignment is to walk through the logical framework (LogFrame) and to create the project
management documents needed to successfully lead a project and to finish answering the question How do we get there?
General Requirements:
• Reread the Kitchen Heaven Project Case Study in Heldman et al. pages 84-87, 139-141, 190-193, and 283-285.
Part 1: Action Steps
• For each activity listed in the Action Steps section in the Logical Framework template complete the Resources, Budget (if given
in the case), and Due Dates.
• Add anticipated resources for each action step/activity. Include all types of resources including human, technical, and physical
resources.
• Add budget information as provided in the case. If budget information not specifically provided in the case, no budget
information is requireal
• Estimate potential due dates for each action step/activity. These estimates should support the planned/expected end date of
the project as defined in the case. Document assumptions made in setting the due dates.
Part 2: RACI Matrix
• Complete the RACI Matrix Template. Add rows as needed.
• Each action step/activity must be listed in the RACI matrix.
Project tasks