Problem Statement
In our school, the principal noticed that the Grade 9 class roof has corroded(rust) and it got big holes,
sun rays pass through even the rain drops pass through in these holes. The principal with the School
Governing Body (SGB) have decided that the Grade 9 class roof need to be replaced with the new roof.
The Mondi company volunteered to sponsor the project. As grade nine (9) learners, you have been
asked to calculate the total cost of this project.
PHASE ONE
Given that the length of the class is 20 m,breadth 10 m,
[11]
Door with the length 8m and breadth of 4 m and windows with the length of 5m and breadth
3m.
Use the scale 5 m: 4 cm to draw the plan of the class foundation plan
(5)
give what it will look like