3.A contract specialist is conducting cost analysis on a production contract for a particular aircraft. Which one of the following costs would most likely be charged as a direct cost? (3 Points) Rent and utilities Specialized tooling for production Labor costs of the general legal counsel for the defense contractor General tooling used for multiple contracts