The NPV method is preferred to the payback period as a project evaluation criterion because the payback period method rule ignores the impact of:
I. The initial cost
II. The timing of cash flows prior to the payback period
III. Any cash flows beyond the payback period

- III only
- II and III only
- l and Il only
- I and III only