In the context of operational protocols, what is the typical procedure if there is a deviation that requires activating all power equipment?
A) Follow the standard emergency procedures, which include assessing the deviation, ensuring safety protocols are in place, and then activating the power equipment as required.
B) Immediately activate all power equipment without assessing the deviation to address the issue swiftly.
C) Deactivate all power equipment to prevent any potential damage or safety hazards caused by the deviation.
D) Delay activation of the power equipment until the deviation has been fully analyzed and reported to a higher authority.