A 400-ft long roller conveyor operates at a velocity = 50 ft/min and is used to move parts in containers between load and unload stations. Each container holds 15 parts. One worker at the load station is able to load parts into containers and place the containers onto the conveyor in 45 sec. It takes 30 sec to unload at the unload station. Determine hourly flow rate of parts.