°
B.
pilot method
Select the correct answer.
An IT company has designed a new logistics system for a transport company. The client allows the developers to take as much time as required to
replace the old system. The developers decide to replace the old system in parts. Which integration method should the IT company use?
A. direct changeover
C. phased method
D. parallel running