eveben
Answered

the efficiency of a machine is 80% calculate the work done by a person using the machine to raise a load of 300kg through a height of 4m (g=10m/s)
please give me a detailed answer



Answer :

Answer:

The work done by the person to raise a load of 300kg through a height of 4m is 3000J

Explanation:

Calculate the work done by the person:

Given efficiency of the machine = 80%

Mass of the load, m = 300kg

Height raised, h = 4m

Acceleration due to gravity, g = 10m/s^2

Calculate the work done by the machine:

Work done by the machine = Work output / Work input

Work output = mgh = 300kg * 10m/s^2 * 4m = 12000J

Work input = Work output / Efficiency = 12000J / 0.80 = 15000J

Calculate the work done by the person:

Work done by the person = Work input - Work output = 15000J - 12000J = 3000J