job set 4 have duration time 140 minutes. there is two AGVs with speed 40m/min and six machine. M1 processing time 5 min distance travel to another machine is 280m to M6 processing time 5 min. then travel 360m to M2 which have processing time 5 min then travel 120m to M3 which have processing time 3 min. after that, the AGVs travel 280m from M3 to M4 which have processing time 8 min and lastly travel 120m to M5 that have processing time 9 min. how to create this job set using anylogic software



Answer :