1. When was the work on Grand Central Terminal started?

2. What caused steam trains to be banned from New York City?

3. How did the Vanderbilts demonstrate the station building's use of electricity?

4. What new feature made it easier for people to move around the station?

5. What change in the station's location had a positive effect on the local area?

6. Who was the first person to travel to the hotel above the station in a special elevator?

7. What was done in the 1990s to provide information about the building's history? Give two details.

8. Which part of the station was later converted into sports facilities?

9. What aspects of the construction process meant that it took a long time to build Grand Central Terminal? Give four details.



Answer :

Final answer:

The detailed answer explores the construction history and significance of Grand Central Terminal.


Explanation:

Grand Central Terminal construction began in 1903 and was completed in 1913. Steam trains were banned due to their pollution and safety concerns. The Vanderbilts showcased electricity in the station's design. New features like passenger elevators eased movement. Relocation of the station had a positive local impact. The station's history was documented in the 1990s. Sports facilities were later integrated. The construction was lengthy due to steel girders, elevators, city expansion, and transit systems.


Learn more about Grand Central Terminal here:

https://brainly.com/question/42171052