To calculate the conversion cost, you need to add the direct labor and factory overheads.
So, Conversion Cost = Direct Labor + Factory Overheads Conversion Cost = R30,000 + R7,000 Conversion Cost = R37,000
Therefore, the correct answer is:
C. R37,000