energy
2 Vivo
is 30,000m
tank reservior whose
has a fuel tank
cap
The tank requires painting because its colour has fedel
due to the effects of weather. The tank is cylindrical
shape and its beight is 10% rather than it's diameter. The
manager in charge of mantaining wishes to have its outer
-Surface / top and curved surface painted. She conducted
a certain Ugandan paint producing company to purchase the
tios of
paint required
Support material
Every 5 litre tin of paint costs 40,000 sh and can paint
60m² of the surface
Task
As
maintainance managed
sales agent of the paint Company, Advise the
on the cost of paint needed for the
repair of the reserved tank.