Which of the following strategies are used in SSM? a) peak time shifts are used to meet periods of high demand. b) longer shifts (e.g., 24-hour shifts) are used to provide coverage. c) ambulances working shorter shifts are assigned the maximum number of calls possible. d) all of the above .