Activity-based costing is much easier to apply than single plantwide factory overhead allocation.
A. True
B. False



Answer :

Answer: This statement is false.

Explanation: Activity-based coding (ABC) generally is more complex and takes more time to apply than a single plant-wide factory overhead allocation. Ultimately, ABC requires more data analyzation contributing to the overhead costs compared to the simpler method of applying a single overhead rate across an entire plant.