The total work done on construction materials during a crane lift can be calculated by considering the force applied at different segments of the lift process.
The total work done on the construction materials can be calculated by breaking down the process into segments and applying the work-energy principle. In this scenario, work is done when an object is moved against a force, resulting in a change in energy.
In the given crane scenario, the total work done is the sum of the work done in each segment of the lift:
The total work done is the sum of the work done in each segment, taking into account the force applied and the distance over which it's applied.
https://brainly.com/question/41526520