Question 4

As a load is mechanically lifted, the materials

A. May strike workers if the load swings, twists, or turns.
B. Will not be affected by windy conditions or bad weather.
C. Can weigh any amount without causing a problem with the equipment.

---

Question 5

[Provide the content for Question 5 here]



Answer :

Final answer:

The total work done on construction materials during a crane lift can be calculated by considering the force applied at different segments of the lift process.


Explanation:

The total work done on the construction materials can be calculated by breaking down the process into segments and applying the work-energy principle. In this scenario, work is done when an object is moved against a force, resulting in a change in energy.

In the given crane scenario, the total work done is the sum of the work done in each segment of the lift:

  1. Work done in the first 10 m where force changes from 0 to 10 kN.
  2. Work done in the next 40 m where a constant force of 10 kN is applied.
  3. Work done in the last 10 m as the force decreases back to 0 N.

The total work done is the sum of the work done in each segment, taking into account the force applied and the distance over which it's applied.


Learn more about Work Done in Crane Lift here:

https://brainly.com/question/41526520