If a spill causes the closure of a loading/unloading facility, who else must be notified besides the local authority and the shipper?

A. the consignee
B. CANUTEC
C. the owner of the vehicle



Answer :

Final answer:

In case of a spill leading to facility closure, the consignee, CANUTEC, and the vehicle owner should be notified for necessary measures.


Explanation:

When a spill causes the closure of a loading/unloading facility, multiple parties need to be notified to ensure appropriate actions are taken. Besides the local authority and the shipper, the consignee, CANUTEC, and the owner of the vehicle must also be informed.


Learn more about Notification of parties in case of facility closure due to a spill here:

https://brainly.com/question/43280488