In case of a spill leading to facility closure, the consignee, CANUTEC, and the vehicle owner should be notified for necessary measures.
When a spill causes the closure of a loading/unloading facility, multiple parties need to be notified to ensure appropriate actions are taken. Besides the local authority and the shipper, the consignee, CANUTEC, and the owner of the vehicle must also be informed.
https://brainly.com/question/43280488